Guro Digital Complex IDC opening promotion

More power.
A lower price.

Compared with the list price, we have increased the base power and lowered the monthly fee. Rack space and power are billed separately, and only power above the base allowance is added, in 1kW units.

Guro Digital Complex IDC opening promotional priceFirst come, first served until all 40 racks are taken
1 Rack 10A · KRW 950,000→ 15A · KRW 890,000−6%
Half Rack 5A · KRW 550,000→ 7A · KRW 450,000−18%
Post-migration support included as standard Relocation and post-migration support are free

All prices are monthly and exclude VAT. The listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. Post-migration support: For contracts of one rack or more, further terms are negotiable in line with the commitment period. The promotion covers 40 racks in total and ends once they are taken. Quarter Rack is not included.

Calculate yourself

Choose and the monthly fee appears

Choose rack space, additional power and an Internet connection. The values are the same as in the price list below.

1 · Choose rack space

2 · Choose additional power

The base power is included in the rack space fee Included. We charge only for the excess, in 1kW units. The cap is +3kW per rack. The limits for Quarter and Half are set after we confirm cooling and distribution headroom.

3 · Choose an Internet connection

To see the monthly total, select one Internet connection. Rack space fees do not include an Internet connection. A one-time installation fee of KRW 50,000 applies, but it is waived on a 12-month term.

Monthly feeReal time
—KRW / mo

Select an Internet connection to see the total

Opening promotional price — the amount after a 6% reduction from the list price of KRW 950,000.

Rack space feeKRW 950,000 KRW 890,000
Base included power3.3kW
Additional power0kW
Additional power fee—
Total power3.3kW
Internet connectionNot selected
Connectivity fee—
Monthly fee—
Request a quote for this configuration

Prices are per month, excluding VAT. Power is metered per rack on actual usage and shown on your invoice.

Rack space fee

Determined by rack size

The price includes base power. VAT is extra.

Swipe sideways to see the remaining columns

TierSpecificationBase power1U unitsList pricePromotional price
Quarter Rack1/42.5A (0.55kW)6 unitsKRW 300,000KRW 300,000
Half Rack1/25A (1.1kW) → 7A (1.54kW)12 unitsKRW 550,000KRW 450,000−18%
Full RackFull rack10A (2.2kW) → 15A (3.3kW)24 unitsKRW 950,000KRW 890,000−6%

The list price is similar to the published prices of major domestic IDC providers. Under the Guro Digital Complex IDC opening promotion, we lowered the price of a full rack and a Half Rack and raised the base power at the same time.
Promotion end condition: First come, first served until all 40 racks are taken. Quarter Rack is not included in the promotion.

Small volume

1U–4U standalone

If a whole rack is too much, we can also take it by server count.

Swipe sideways to see the remaining columns

SpecificationIncluded powerMonthly feeLowest published competitor price
1U0.7kWKRW 65,00066,000~70,000
2U1.0kWKRW 78,00080,000~99,000
4U1.5kWKRW 135,000140,000~150,000
Published

Additional power rate

Apply for what exceeds the base power in 1kW units. Of the twenty-odd domestic providers we surveyed, only one published this rate as a number.

Swipe sideways to see the remaining columns

UseAdditional powerMonthly feeFull rack totalTotal powerConverted per kW
For general serversBase only—KRW 890,0003.3kWKRW 269,697
For high-performance servers+1kWKRW 163,000KRW 1,053,0004.3kWKRW 244,884
For GPU servers+2kWKRW 326,000KRW 1,216,0005.3kWKRW 229,434
For high-performance AI training+3kWKRW 489,000KRW 1,379,0006.3kWKRW 218,889

A flat KRW 163,000 per kW. No tiered surcharge and no volume discount.
Power is metered per rack on actual usage and shown on each monthly invoice.
If you exceed the power you applied for we bill the excess separately, and we tell you before that happens.
For configurations above +3kW we will check facility headroom and advise separately.

Internet connection

Connectivity fees are listed too

Colocation pricing is not set by rack space alone. Power and network connection costs are what make up the actual bill. Most domestic colocation providers we surveyed quote connection rates only on request — we list all four as they are.

Swipe sideways to see the remaining columns

ProductTypeBandwidthTrafficMonthly fee
XDN Burst 100
1U to Quarter Rack, small scale · general web services
Burst typeUp to 100Mbps · 10Mbps guaranteed600GB/mo included · up to 1,000GB over at KRW 70 per GB, above that KRW 60 per GBKRW 90,000
Backbone 100M
Enterprise web services that need guaranteed bandwidth · separated DB and WAS architectures
Backbone-guaranteed100Mbps guaranteed bandwidth, 24 hoursFlat rate — not meteredKRW 450,000
Backbone 300M
Colocation with many servers · media and file services
Backbone-guaranteed300Mbps guaranteed bandwidth, 24 hoursFlat rate — not meteredKRW 1,250,000
Backbone 500M
Large-scale colocation · services that use bandwidth continuously
Backbone-guaranteed500Mbps guaranteed bandwidth, 24 hoursFlat rate — not meteredKRW 1,900,000
Backbone 1G
GPU and AI training · services with heavy traffic where guaranteed bandwidth matters
Backbone-guaranteed1Gbps guaranteed bandwidth, 24 hoursFlat rate — not meteredKRW 3,300,000

Prices are monthly and exclude VAT. A one-time installation fee of KRW 50,000 applies, but it is waived on a 12-month term.
Listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. The terms are the same as for rack space and power.
Tiers can be raised or lowered monthly, and the month of the change is settled pro rata.

XDN Burst 100 — what happens if I exceed it

We charge only for what exceeds 600GB — KRW 70 per GB up to 1,000GB and KRW 60 per GB above that. The more you use, the lower the unit price. As for speed, the port caps at 100Mbps and does not go higher.

Backbone 100M — what happens if I exceed it

There is no traffic overage. The port speed is the cap. If you run above 90% for consecutive months we will suggest a higher tier.

Backbone 300M — what happens if I exceed it

There is no traffic overage. The price per Mbps is lower than on the 100M plan.

Backbone 500M — what happens if I exceed it

There is no traffic overage. The price per Mbps is lower than 300M.

Backbone 1G — what happens if I exceed it

There is no traffic overage. Transfer beyond 1Gbps physically cannot happen. If you need more bandwidth we will quote separately.

Base configuration

Things you do not need to buy separately

Network

10G network is provided as standard. Choose an Internet connection from the four above; the price is exactly as stated in the price list.

Firewall

10Gbps firewall are provided as standard. You do not need to buy equipment separately. L2 and L3 network equipment is also available for rent.

Backbone

Configuring both the main and server-room backbone switches at 100G, 400G of capacity in total. We use 200Gbit/sec domestic and 20Gbit/sec international dedicated lines. A dedicated 100G setup is also possible if needed.

Traffic

Traffic between servers inside the IDC is free. You get a usage report every month at no charge.

Free of charge

Included at no extra charge

The following are included in the contract. They will not appear on a later invoice.

Swipe sideways to see the remaining columns

ItemDetails
Installation feeRack installation and initial setup
Name serverDomain registration and name server setup
MonitoringThree-stage alarms configured by default
Vulnerability checkServer vulnerability check
Build consultationOn-site consulting
Technical support24/7 monitoring and technical support
Traffic within the IDCNo charge for server-to-server traffic
Usage reportMonthly traffic usage report

As add-ons we also offer a web application firewall and CDP backup. Pricing is given during consultation.

Price comparison

Full-rack price comparison

All the competitors below have a full-rack base power of 10A (2.2kW). Under our opening promotion we 15A(3.3kW), so the power terms are not the same — comparing on price alone tilts the result, so look at the power column too.

Swipe sideways to see the remaining columns

ProviderQuarterHalfFullFull rack base power
XDN IDC BasisKRW 300,000KRW 450,000KRW 890,00015A (3.3kW)
GabiaKRW 300,000KRW 550,000KRW 1,000,00010A (2.2kW)
Cafe24KRW 270,000KRW 540,000KRW 1,080,00010A (2.2kW)
KT cloudKRW 436,000KRW 653,000KRW 1,087,0002.2kW

Surveyed 14 August 2026 and re-checked 1 September. Based on each company's published pricing pages, all excluding VAT.
Providers that operate by quotation only and publish no prices were excluded from the comparison. KT cloud charges a separate installation fee of KRW 300,000.
Our KRW 890,000 is the Opening promotional price, with a list price of KRW 950,000. The promotion runs until all 40 racks are taken.

Full-rack monthly fees surveyed (competitors' published prices)

This is an industry that does not publish pricing; we print the figures we surveyed as they are. All Full rack base 10A (2.2kW) as the basis.

Gabia KRW 1,000,000Cafe24 KRW 1,080,000KT cloud KRW 1,087,000Korea Data Communications KRW 1,250,000Broadband IDC KRW 1,300,000

Based on a survey of each company's published pricing pages on 1 September 2026, all excluding VAT.

The one figure you can compare like for like is KT cloud's KRW 200,000 per extra kW against our KRW 163,000. KT lists it as KRW 220,000 per 1.1kW; its page does not mention VAT, so we treated the figure as excluding VAT.

Comparison conditions for this chart

The chart shows each company's full-rack base 10A(2.2kW) as the basis. We price rack space and power separately and have no figure that matches the single 2.2kW condition, so no bar is drawn.

Other than standard racks

The 20kW-and-above range

The price list above is for standard racks. GPU and high-density workloads differ from the cooling method onward, so they form a separate line-up.

Swipe sideways to see the remaining columns

ProductPowerCoolingMonthly feeUse
GPU Rack 2020kWAir cooling + rear door (RDHx)KRW 3,380,000H100/H200-class inference and rendering
GPU Rack 3030kWRDHx or direct-to-chip coolingKRW 5,070,000Medium-density training and inference
GPU Rack 4040kWDirect-to-chip cooling (D2C)Coming soonHigh density — enquire about the rollout schedule

This differs from adding power to a standard rack (up to 6.3kW). As the cooling method differs, a consultation is needed before deployment.

Operations

Facilities and SLA

Power redundancy

UPS redundancy · emergency generator with fuel always on hand · dual power feeds at rack level · published actual power meter readings

Cooling

Hot-aisle containment · rear-door cooling in the high-density zone · continuous temperature and humidity monitoring · D2C liquid cooling in preparation

Connectivity

Multi-ISP redundancy · published guaranteed bandwidth and excess rates · Cross-Connect available · DDoS protection option

Security & fire

24/7 on-site monitoring · access control and CCTV · gas fire suppression · water leak and early fire detection

Centers: SK IDC Seocho · KT IDC Mokdong · HiOnNet IDC Guro
Specific uptime guarantees and compensation terms are stated in the contract. Facility specifications may differ by centre and are confirmed at quotation.

Show us the invoice you are paying now

Just tell us the rack count, power and network connections at your current IDC and we will calculate the savings within 30 minutes. There is nothing to lose by comparing.

Request a Quote 02-3667-3441

Prices as of

Frequently Asked Questions

Colocation

Do I also need to contract an Internet connection?
Yes. Rack space and power alone do not connect a server to the Internet. Choose an Internet connection from five options; the price is exactly as stated in the price list — from KRW 90,000 for XDN Burst 100 up to KRW 3,300,000 for Backbone 1G. If you are bringing an existing connection across, it depends on the setup, so we will advise you separately.
Can I change my connection tier later?
You can raise or lower it monthly, with the month of the change settled pro rata. If you are on XDN Burst 100 and exceed the allowance three months running, we will suggest a higher tier — but we do not force a change. The decision is yours; we simply calculate which option is cheaper.
Can I use something smaller than a Quarter Rack (KRW 300,000)?
Yes. If you only have one or two units, 1U–4U standalone is lower — 1U starts at KRW 65,000 (0.7kW included). A Quarter Rack holds six 1U units, so when there are more than three units the price per unit comes down. Tell us the power and the number of units you need and we will work out which is better for you.
What does the opening promotion change?
We lowered the price and raised the base power at the same time. A rack is normally 10A (2.2kW) at KRW 950,000; during the promotion it is 15A (3.3kW) at KRW 890,000 — one and a half times the power at a lower price. Half Rack also goes from 5A (1.1kW) to 7A (1.54kW). Quarter Rack is not included in the promotion. There are 40 racks in total and it ends once they are taken.
Do you charge extra if I exceed the contracted power?
We have not created a separate excess fee. If you go over, we add power in 1kW units — the rate is KRW 163,000 per kW with no tiered surcharge. We notify you in advance as you approach your contracted power.
How much additional power can I add?
In 1kW units, up to +3kW per rack. The rate is KRW 163,000 per kW with no tiered surcharge. Adding +3kW to the promotional base of 15A (3.3kW) for one rack gives up to 6.3kW. If you need higher density, see the 20–40kW high-power rack line-up — a separate product with different cooling.
How is power calculated and billed?
We meter per rack on actual usage and show it on the invoice. The contracted power is the capacity available to you; billing is by the tier price — we do not charge extra by usage.
Is relocation really free?
We do not charge for migration consulting, relocation work or post-migration support. Post-migration support is one month for everyone, extendable to up to three months by agreement. The conditions are set out in full in the table in the "free of charge" section.
What changes above 20kW?
The price is the same as the tier table; the cooling method differs. 20kW uses air cooling plus a rear door (RDHx); 30kW uses RDHx or direct-to-chip cooling. The 40kW range is not yet offered as a product.
Do the prices include VAT?
No. All prices in the table are monthly and exclude VAT. Listed prices are based on a 12-month term, with 5% off on a 24-month term and 10% off on a 36-month term.