More power.
A lower price.
Compared with the list price, we have increased the base power and lowered the monthly fee. Rack space and power are billed separately, and only power above the base allowance is added, in 1kW units.
All prices are monthly and exclude VAT. The listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. Post-migration support: For contracts of one rack or more, further terms are negotiable in line with the commitment period. The promotion covers 40 racks in total and ends once they are taken. Quarter Rack is not included.
Choose and the monthly fee appears
Choose rack space, additional power and an Internet connection. The values are the same as in the price list below.
1 · Choose rack space
2 · Choose additional power
The base power is included in the rack space fee Included. We charge only for the excess, in 1kW units. The cap is +3kW per rack. The limits for Quarter and Half are set after we confirm cooling and distribution headroom.
3 · Choose an Internet connection
To see the monthly total, select one Internet connection. Rack space fees do not include an Internet connection. A one-time installation fee of KRW 50,000 applies, but it is waived on a 12-month term.
Select an Internet connection to see the total
Opening promotional price — the amount after a 6% reduction from the list price of KRW 950,000.
Prices are per month, excluding VAT. Power is metered per rack on actual usage and shown on your invoice.
Determined by rack size
The price includes base power. VAT is extra.
Swipe sideways to see the remaining columns
| Tier | Specification | Base power | 1U units | List price | Promotional price | |
|---|---|---|---|---|---|---|
| Quarter Rack | 1/4 | 2.5A (0.55kW) | 6 units | KRW 300,000 | KRW 300,000 | |
| Half Rack | 1/2 | 12 units | KRW 450,000 | −18% | ||
| Full Rack | Full rack | 24 units | KRW 890,000 | −6% |
The list price is similar to the published prices of major domestic IDC providers. Under the
Guro Digital Complex IDC opening promotion, we lowered the price of a full rack and a Half Rack and raised the base power at the same time.
Promotion end condition: First come, first served until all 40 racks are taken. Quarter Rack is not included in the promotion.
1U–4U standalone
If a whole rack is too much, we can also take it by server count.
Swipe sideways to see the remaining columns
| Specification | Included power | Monthly fee | Lowest published competitor price |
|---|---|---|---|
| 1U | 0.7kW | KRW 65,000 | 66,000~70,000 |
| 2U | 1.0kW | KRW 78,000 | 80,000~99,000 |
| 4U | 1.5kW | KRW 135,000 | 140,000~150,000 |
Additional power rate
Apply for what exceeds the base power in 1kW units. Of the twenty-odd domestic providers we surveyed, only one published this rate as a number.
Swipe sideways to see the remaining columns
| Use | Additional power | Monthly fee | Full rack total | Total power | Converted per kW |
|---|---|---|---|---|---|
| For general servers | Base only | — | KRW 890,000 | 3.3kW | KRW 269,697 |
| For high-performance servers | +1kW | KRW 163,000 | KRW 1,053,000 | 4.3kW | KRW 244,884 |
| For GPU servers | +2kW | KRW 326,000 | KRW 1,216,000 | 5.3kW | KRW 229,434 |
| For high-performance AI training | +3kW | KRW 489,000 | KRW 1,379,000 | 6.3kW | KRW 218,889 |
A flat KRW 163,000 per kW. No tiered surcharge and no volume discount.
Power is metered per rack on actual usage and shown on each monthly invoice.
If you exceed the power you applied for we bill the excess separately, and we tell you before that happens.
For configurations above +3kW we will check facility headroom and advise separately.
Connectivity fees are listed too
Colocation pricing is not set by rack space alone. Power and network connection costs are what make up the actual bill. Most domestic colocation providers we surveyed quote connection rates only on request — we list all four as they are.
Swipe sideways to see the remaining columns
| Product | Type | Bandwidth | Traffic | Monthly fee |
|---|---|---|---|---|
| XDN Burst 100 1U to Quarter Rack, small scale · general web services | Burst type | Up to 100Mbps · 10Mbps guaranteed | 600GB/mo included · up to 1,000GB over at KRW 70 per GB, above that KRW 60 per GB | KRW 90,000 |
| Backbone 100M Enterprise web services that need guaranteed bandwidth · separated DB and WAS architectures | Backbone-guaranteed | 100Mbps guaranteed bandwidth, 24 hours | Flat rate — not metered | KRW 450,000 |
| Backbone 300M Colocation with many servers · media and file services | Backbone-guaranteed | 300Mbps guaranteed bandwidth, 24 hours | Flat rate — not metered | KRW 1,250,000 |
| Backbone 500M Large-scale colocation · services that use bandwidth continuously | Backbone-guaranteed | 500Mbps guaranteed bandwidth, 24 hours | Flat rate — not metered | KRW 1,900,000 |
| Backbone 1G GPU and AI training · services with heavy traffic where guaranteed bandwidth matters | Backbone-guaranteed | 1Gbps guaranteed bandwidth, 24 hours | Flat rate — not metered | KRW 3,300,000 |
Prices are monthly and exclude VAT. A one-time installation fee of KRW 50,000 applies, but it is waived on a 12-month term.
Listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. The terms are the same as for rack space and power.
Tiers can be raised or lowered monthly, and the month of the change is settled pro rata.
XDN Burst 100 — what happens if I exceed it
We charge only for what exceeds 600GB — KRW 70 per GB up to 1,000GB and KRW 60 per GB above that. The more you use, the lower the unit price. As for speed, the port caps at 100Mbps and does not go higher.
Backbone 100M — what happens if I exceed it
There is no traffic overage. The port speed is the cap. If you run above 90% for consecutive months we will suggest a higher tier.
Backbone 300M — what happens if I exceed it
There is no traffic overage. The price per Mbps is lower than on the 100M plan.
Backbone 500M — what happens if I exceed it
There is no traffic overage. The price per Mbps is lower than 300M.
Backbone 1G — what happens if I exceed it
There is no traffic overage. Transfer beyond 1Gbps physically cannot happen. If you need more bandwidth we will quote separately.
Things you do not need to buy separately
Network
10G network is provided as standard. Choose an Internet connection from the four above; the price is exactly as stated in the price list.
Firewall
10Gbps firewall are provided as standard. You do not need to buy equipment separately. L2 and L3 network equipment is also available for rent.
Backbone
Configuring both the main and server-room backbone switches at 100G, 400G of capacity in total. We use 200Gbit/sec domestic and 20Gbit/sec international dedicated lines. A dedicated 100G setup is also possible if needed.
Traffic
Traffic between servers inside the IDC is free. You get a usage report every month at no charge.
Included at no extra charge
The following are included in the contract. They will not appear on a later invoice.
Swipe sideways to see the remaining columns
| Item | Details |
|---|---|
| Installation fee | Rack installation and initial setup |
| Name server | Domain registration and name server setup |
| Monitoring | Three-stage alarms configured by default |
| Vulnerability check | Server vulnerability check |
| Build consultation | On-site consulting |
| Technical support | 24/7 monitoring and technical support |
| Traffic within the IDC | No charge for server-to-server traffic |
| Usage report | Monthly traffic usage report |
As add-ons we also offer a web application firewall and CDP backup. Pricing is given during consultation.
Full-rack price comparison
All the competitors below have a full-rack base power of 10A (2.2kW). Under our opening promotion we 15A(3.3kW), so the power terms are not the same — comparing on price alone tilts the result, so look at the power column too.
Swipe sideways to see the remaining columns
| Provider | Quarter | Half | Full | Full rack base power |
|---|---|---|---|---|
| XDN IDC Basis | KRW 300,000 | KRW 450,000 | KRW 890,000 | 15A (3.3kW) |
| Gabia | KRW 300,000 | KRW 550,000 | KRW 1,000,000 | 10A (2.2kW) |
| Cafe24 | KRW 270,000 | KRW 540,000 | KRW 1,080,000 | 10A (2.2kW) |
| KT cloud | KRW 436,000 | KRW 653,000 | KRW 1,087,000 | 2.2kW |
Surveyed 14 August 2026 and re-checked 1 September. Based on each company's published pricing pages, all excluding VAT.
Providers that operate by quotation only and publish no prices were excluded from the comparison. KT cloud charges a separate installation fee of KRW 300,000.
Our KRW 890,000 is the Opening promotional price, with a list price of KRW 950,000. The promotion runs until all 40 racks are taken.
Full-rack monthly fees surveyed (competitors' published prices)
This is an industry that does not publish pricing; we print the figures we surveyed as they are. All Full rack base 10A (2.2kW) as the basis.
Based on a survey of each company's published pricing pages on 1 September 2026, all excluding VAT.
The one figure you can compare like for like is KT cloud's KRW 200,000 per extra kW against our KRW 163,000. KT lists it as KRW 220,000 per 1.1kW; its page does not mention VAT, so we treated the figure as excluding VAT.
Comparison conditions for this chart
The chart shows each company's full-rack base 10A(2.2kW) as the basis. We price rack space and power separately and have no figure that matches the single 2.2kW condition, so no bar is drawn.
The 20kW-and-above range
The price list above is for standard racks. GPU and high-density workloads differ from the cooling method onward, so they form a separate line-up.
Swipe sideways to see the remaining columns
| Product | Power | Cooling | Monthly fee | Use |
|---|---|---|---|---|
| GPU Rack 20 | 20kW | Air cooling + rear door (RDHx) | KRW 3,380,000 | H100/H200-class inference and rendering |
| GPU Rack 30 | 30kW | RDHx or direct-to-chip cooling | KRW 5,070,000 | Medium-density training and inference |
| GPU Rack 40 | 40kW | Direct-to-chip cooling (D2C) | Coming soon | High density — enquire about the rollout schedule |
This differs from adding power to a standard rack (up to 6.3kW). As the cooling method differs, a consultation is needed before deployment.
Facilities and SLA
Power redundancy
UPS redundancy · emergency generator with fuel always on hand · dual power feeds at rack level · published actual power meter readings
Cooling
Hot-aisle containment · rear-door cooling in the high-density zone · continuous temperature and humidity monitoring · D2C liquid cooling in preparation
Connectivity
Multi-ISP redundancy · published guaranteed bandwidth and excess rates · Cross-Connect available · DDoS protection option
Security & fire
24/7 on-site monitoring · access control and CCTV · gas fire suppression · water leak and early fire detection
Centers: SK IDC Seocho · KT IDC Mokdong · HiOnNet IDC Guro
Specific uptime guarantees and compensation terms are stated in the contract. Facility specifications may differ by centre and are confirmed at quotation.
Show us the invoice you are paying now
Just tell us the rack count, power and network connections at your current IDC and we will calculate the savings within 30 minutes. There is nothing to lose by comparing.
Prices as of