Guro Digital Complex IDC, Seoul —
Colocation · Dedicated servers · Virtual servers
More base power, lower monthly rates.
Against the list price, we have added base power and lowered the monthly rate. Rack space and power are billed separately, so you only pay extra for power above the base allowance, in 1kW steps.
All prices are monthly VAT excluded. Listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. Additional power is KRW 163,000 per kW, up to +3kW per rack.
The promotion covers a total of 40 Rack and ends once they are taken. Quarter Rack is not included in the promotion.
All XDN IDC services at a glance
VM Hosting
Shared virtual servers. The traffic allowance and the excess rate are both listed.
- 1–8 vCPU · up to 8GB
- Outbound 20GB/day · unlimited inbound
- Windows option available
VM-attached storage
High-capacity storage that attaches directly to VM Hosting. For backups and temporary backups.
- 1TB KRW 30,000 · 10TB bundle KRW 270,000
- Up to 70TB · freely combine 1TB and 10TB
- High-capacity HDD · RAID6
Colocation opening promotion
What was 10A (2.2kW) at KRW 950,000 is now 15A (3.3kW) at KRW 890,000. One and a half times the power, at a lower price.
- 1 rack 15A (3.3kW) — 6% below list
- Half Rack 7A (1.54kW) KRW 450,000
- First come, first served until all 40 racks are taken
Colocation
From single 1U units to 30kW high-density racks. Power and network connection terms are stated explicitly.
- KRW 950,000 per rack — 10A (2.2kW)
- We publish additional power at KRW 163,000 per kW
- After you apply we will discuss the centre by phone
XDN Fit — move servers to Korea
Your hardware into a Seoul data center. A one-time package covering the fit check, customs partner introduction, goods-in inspection, installation and the go-live report.
- Fit-Gap report · goods-in photo report · go-live report
- Monthly rack space, power and network connection at our published colocation rates
- Atlas Networks is not the importer of record (IOR)
Dedicated Server Hosting
Three bare-metal dedicated server rentals. Billed monthly, with no purchase option.
- 48 threads · 64GB · SSD 500GB
- Outbound 40GB/day · unlimited inbound
- Free replacement on hardware failure
Listed prices are monthly and exclude VAT.
What is included free
Free relocation and free post-migration support
Security and infrastructure assessments are also free of charge.
No relocation fee
We do not charge for transporting and reinstalling equipment. We cut over at the quietest traffic hours and roll back immediately if anything goes wrong.
Migration consulting free
From migration design and risk analysis to zero-downtime cutover and rollback design. About two weeks, at no charge.
Post-migration support free
Post-migration support is free for the first month. Depending on the scale of the move, it can be extended to up to three months by agreement.
Three assessments free
We assess infrastructure, security and hardware assets. The report is yours to use even if you do not sign.
Post-migration support covers one month for everyone, and up to three months by agreement for larger moves. Free relocation and migration consulting apply to new contracts. The hardware asset check is free for up to 10 units; for more, we quote based on the size of the job. Prices shown are per month, excluding VAT.
KT Mok-dong · SK Seocho · HiOnNet Guro
Dedicated infrastructure in three centres
We do not put everything in one place. Each centre has its own role, and when needed Split across centres for redundancy.
KT Mok-dong
This is our primary infrastructure. VM Hosting and large storage are served from this centre.
- All VM Hosting tiers
- Dedicated nodes for large storage
- Dedicated rack · own equipment
HiOnNet Guro
This centre provides colocation. We have secured rack space in IDC 2, now under construction.
- Colocation rack space
- Moving into the new IDC 2
- By rack · by 1U–4U
SK Seocho
This centre is for distributed placement and redundancy. Rack space is allocated after consultation.
- Colocation rack space
- Distributed centres · redundant setup
- Separate network paths
VM Hosting is placed in an available centre, so you do not need to specify a centre. For colocation, we will call you after you apply, and together we will decide which centre and on what terms we can provide it.
The photo, showing a typical data centre environment, is a reference image and is not a photograph of our own facility. You can inspect the actual facility on site by appointment.
We also look beyond the infrastructure
We also provide the security, cloud and hardware management that running servers requires. Even when you use several services, your billing comes from one place.
Security
From SSL, antivirus and ransomware blocking to WAF and DDoS protection — 14 products in one price list.
- 4 SSL types · from KRW 14,850/yr
- WAF is not charged per domain
- Three bundled packages
AWS
We bill your AWS usage in KRW and operate it for you, together with an Advanced Consulting Partner.
- KRW billing · tax invoice
- Incident SLA 1 hour (24/7)
- One architecture review free
HW Consulting
Servers, GPUs, service networks, security, backups — we look at any part of your IT infrastructure. The assessment is free and the report is independent of any contract.
- Reply within 1 business day
- Rack space, power, network and licence analysis
- Materials for renewal negotiations
Managed Hardware Maintenance
No need to hire hardware engineers. A team of engineers with 20–30 years of experience operates and maintains your equipment.
- Asset register · SMART · 24-hour monitoring
- Spare parts · replacement on failure · backup
- Free assessment for 10 units or fewer
Listed prices are monthly and exclude VAT.
The charges to check
when comparing IDCs
Monthly IDC costs depend not only on rack space but also on power and network connection terms. Here are four things to check before you sign.

Excess power rate
Extra power is KRW 163,000 per kW. Order it in 1kW steps, up to +3kW per rack. The rate stays the same however much you add.
Electricity settlement method
Any PUE pass-through is clearly stated in the contract. Each monthly invoice shows how the charge was worked out and the meter readings.
Installation & relocation
No installation fee. We plan the move from your current IDC and carry it out with you.
Contract terms
Minimum 12 months · 3 racks (15kW) as the basis. Small volumes and short terms have separate rates.
How much is that in power terms
We calculated the total when rack space and power are billed separately. Set the power you need, and the number of racks and the monthly fee are calculated together.
Set the power you need between 1 and 40kW, and the number of racks and the monthly fee are calculated together.
Base power 3.3kW plus 2kW of additional power, configured in 1 rack.
Based on KT cloud's published prices · full rack KRW 1,087,000 + additional power KRW 200,000 per kW (surveyed 25 September 2026). KT states power KRW 220,000 per 1.1kW and, as that page does not state VAT, we treated it as VAT excluded. KT cloud's base power is 2.2kW, so the power terms are not the same
What kind of environment will it go into
You can see the rack row layout, aisle widths and working routes in advance. Book ahead and check on site.
The photo below is a reference image showing a typical data centre environment and is not a photograph of our own facility. You can inspect the actual facility on site by appointment.

Common questions
Where are the centres, and can I visit to see them in person?
What happens if power runs short?
How is this price possible?
How is traffic charged?
How long does it take to move from my current IDC?
Can GPU servers be hosted too?
Start with an assessment
Just give us the rack count, server count, network connection terms and monthly bill, and we will start by finding where you can cut. The report is provided regardless of any contract.