Guro Digital Complex IDC opening promotion

Guro Digital Complex IDC, Seoul —
Colocation · Dedicated servers · Virtual servers

More base power, lower monthly rates.

Against the list price, we have added base power and lowered the monthly rate. Rack space and power are billed separately, so you only pay extra for power above the base allowance, in 1kW steps.

Guro Digital Complex IDC opening promotional priceFirst come, first served until all 40 racks are taken
Full Rack 10A · KRW 950,000→ 15A · KRW 890,000−6%
Half Rack 5A · KRW 550,000→ 7A · KRW 450,000−18%
No relocation fee Migration consulting free 1 month of post-migration support, free Three assessments free

All prices are monthly VAT excluded. Listed prices are based on a 12-month term, with 5% off on 24-month term · 10% off on 36-month term. Additional power is KRW 163,000 per kW, up to +3kW per rack.
The promotion covers a total of 40 Rack and ends once they are taken. Quarter Rack is not included in the promotion.

All XDN IDC services at a glance

VM Hosting

Shared virtual servers. The traffic allowance and the excess rate are both listed.

5,040KRW/mo and up
  • 1–8 vCPU · up to 8GB
  • Outbound 20GB/day · unlimited inbound
  • Windows option available
Contact Us

VM-attached storage

High-capacity storage that attaches directly to VM Hosting. For backups and temporary backups.

30,000KRW/mo and up
  • 1TB KRW 30,000 · 10TB bundle KRW 270,000
  • Up to 70TB · freely combine 1TB and 10TB
  • High-capacity HDD · RAID6
Contact Us

Colocation opening promotion

What was 10A (2.2kW) at KRW 950,000 is now 15A (3.3kW) at KRW 890,000. One and a half times the power, at a lower price.

890,000KRW/mo
  • 1 rack 15A (3.3kW) — 6% below list
  • Half Rack 7A (1.54kW) KRW 450,000
  • First come, first served until all 40 racks are taken
View promotional pricing

Colocation

From single 1U units to 30kW high-density racks. Power and network connection terms are stated explicitly.

65,000KRW/mo and up
  • KRW 950,000 per rack — 10A (2.2kW)
  • We publish additional power at KRW 163,000 per kW
  • After you apply we will discuss the centre by phone
See prices

XDN Fit — move servers to Korea

Your hardware into a Seoul data center. A one-time package covering the fit check, customs partner introduction, goods-in inspection, installation and the go-live report.

450,000KRW, one-time starting price
  • Fit-Gap report · goods-in photo report · go-live report
  • Monthly rack space, power and network connection at our published colocation rates
  • Atlas Networks is not the importer of record (IOR)
See XDN Fit

Dedicated Server Hosting

Three bare-metal dedicated server rentals. Billed monthly, with no purchase option.

239,400KRW/mo and up
  • 48 threads · 64GB · SSD 500GB
  • Outbound 40GB/day · unlimited inbound
  • Free replacement on hardware failure
See prices

Listed prices are monthly and exclude VAT.

Free

What is included free

Free relocation and free post-migration support
Security and infrastructure assessments are also free of charge.

No relocation fee

We do not charge for transporting and reinstalling equipment. We cut over at the quietest traffic hours and roll back immediately if anything goes wrong.

Migration consulting free

From migration design and risk analysis to zero-downtime cutover and rollback design. About two weeks, at no charge.

Post-migration support free

Post-migration support is free for the first month. Depending on the scale of the move, it can be extended to up to three months by agreement.

Three assessments free

We assess infrastructure, security and hardware assets. The report is yours to use even if you do not sign.

Post-migration support covers one month for everyone, and up to three months by agreement for larger moves. Free relocation and migration consulting apply to new contracts. The hardware asset check is free for up to 10 units; for more, we quote based on the size of the job. Prices shown are per month, excluding VAT.

Infrastructure status

KT Mok-dong · SK Seocho · HiOnNet Guro
Dedicated infrastructure in three centres

We do not put everything in one place. Each centre has its own role, and when needed Split across centres for redundancy.

VM Hosting is placed in an available centre, so you do not need to specify a centre. For colocation, we will call you after you apply, and together we will decide which centre and on what terms we can provide it.
The photo, showing a typical data centre environment, is a reference image and is not a photograph of our own facility. You can inspect the actual facility on site by appointment.

Pricing structure

The charges to check
when comparing IDCs

Monthly IDC costs depend not only on rack space but also on power and network connection terms. Here are four things to check before you sign.

A power distribution unit (PDU) at the rear of a rack, with a current display and tidied power cables.

Excess power rate

Extra power is KRW 163,000 per kW. Order it in 1kW steps, up to +3kW per rack. The rate stays the same however much you add.

Electricity settlement method

Any PUE pass-through is clearly stated in the contract. Each monthly invoice shows how the charge was worked out and the meter readings.

Installation & relocation

No installation fee. We plan the move from your current IDC and carry it out with you.

Contract terms

Minimum 12 months · 3 racks (15kW) as the basis. Small volumes and short terms have separate rates.

Calculate yourself

How much is that in power terms

We calculated the total when rack space and power are billed separately. Set the power you need, and the number of racks and the monthly fee are calculated together.

Power needed → racks needed → monthly feeReal time
5kW1 rack

Set the power you need between 1 and 40kW, and the number of racks and the monthly fee are calculated together.

110203040

Base power 3.3kW plus 2kW of additional power, configured in 1 rack.

Racks required (max 6.3kW per rack)1rack
Additional power2kW
Based on KT cloud published pricesKRW 1,450,636
XDN monthly feeKRW 1,216,000
Monthly KRW 234,636 · per year KRW 2,815,632 Savings
Based on KT cloud's published prices · full rack KRW 1,087,000 + additional power KRW 200,000 per kW (surveyed 25 September 2026). KT states power KRW 220,000 per 1.1kW and, as that page does not state VAT, we treated it as VAT excluded. KT cloud's base power is 2.2kW, so the power terms are not the same
Facilities

What kind of environment will it go into

You can see the rack row layout, aisle widths and working routes in advance. Book ahead and check on site.

The photo below is a reference image showing a typical data centre environment and is not a photograph of our own facility. You can inspect the actual facility on site by appointment.

The telecom entry room. Fibre trunks arriving via the overhead tray split into two distribution boxes.
A data centre aisle with rows of racks on both sides and a work cart in the walkway.
Inside the control room. Multiple monitors show surveillance views and system diagrams, with staff at their desks.
FAQ

Common questions

Where are the centres, and can I visit to see them in person?
Book ahead and see the site for yourself. Looking at the rack rows, power entry, cooling and access control tells you more than a list of specifications. The centre location, incoming power capacity, rack capacity and network carriers are stated in the quotation. If you would like to visit, mention it when you request a quote.
What happens if power runs short?
Additional power is KRW 163,000 per kW and you apply in 1kW units. Up to +3kW per rack, with no tiered surcharge. We notify you before you approach your contracted power, and expansion is done by the rack. Settlement is based on actual usage, and meter readings are recorded on each monthly invoice.
How is this price possible?
There are two reasons. First, rack space and power are billed separately. Bundling makes customers who use less power pay for what they did not use. Billing separately avoids that and lets us reflect power costs accurately in the price. Second, we procure and operate the equipment ourselves. With no intermediate distribution step, we can offer higher specifications for the same budget.
How is traffic charged?
We count only what goes out. The allowance in the price list is for outbound (egress), and inbound (ingress) is unmetered — inbound traffic is not charged. For outbound, each product's base allowance and excess rate are stated in the price list. Services with heavy traffic can contract a guaranteed bandwidth at a flat rate, with the excess-fee cap stated in the contract. We do not write "unlimited" and then attach limits afterwards.
How long does it take to move from my current IDC?
For three racks, the up-front design takes one to two weeks. The actual move is done without downtime over one or two nights. Installation and migration support are free, and we build the rollback plan with you.
Can GPU servers be hosted too?
20–30kW per rack is also priced in the price list. High-density racks use rear-door cooling. Above 40kW is by separate arrangement.

Start with an assessment

Just give us the rack count, server count, network connection terms and monthly bill, and we will start by finding where you can cut. The report is provided regardless of any contract.

Request a free assessment